Coating of Pumps, Valves, Pipelines for Sustainable Energy Efficiency Improvement

We offer energy efficiency improvement coating solutions for pumps, valves and pipelines.

Life Cycle Cost of Pump -Initial Cost – 5 to 10 %, Operating Cost- 90-95 %

Efficiency When New After 15 Years
Pump 85% 70%
Motor 95% 93%
Pipe 85% 78%
Valve 95% 75%

 

95%of the running cost of a pump is towards cost of electricity. Normally pump efficiency drops at 1% per annum for drinking water application due to erosion and corrosion.

Buying decision on the basis of
PRICE alone Mostly
EFFICIENCY Few Times
SUSTAINANCE OF EFFICIENCY Rarely

 

Objectives of coating at project stage for new pumps

  • Corrocoating new pump to retain performance and reduce efficiency degradation.
  • Coating of Pipe Lines for Head Losses Reduction.
  • Coating of Valves.
  • Low life cycle cost–sustenance of efficiency.

Objectives of coating at old pumps

  • Conduct Energy Audit of pumping system.
  • Refurbishment and Dynamic Balancing.
  • Restoration of hydraulic tolerances.
  • Economically viable solution.
  • Attractive Payback Period (Less than a year).
  • Reduction in Power Consumption from 4 to 16 %.
  • Improved performance continues for at least 3 years.

More Services

Third Party Inspections

We offer third party inspection services for all electromechanical equipments in WTP & Pumping Stations as per National/International Standards. Third-party

Read More »