Booster Pump Stations are required at ESR outlet to meet revised residual pressure as per CPHEEO guidelines. Conventional pumping station project with civil structures & piping works usually takes 12-18 months. Another constraint is limited space in ESR premises within city limit. We offer Skid mounted package Booster Pumps Station as a customised solution for 24×7 continuous water supply to the distribution network, avoiding major site modifications. This booster pumping station can be operated in fully automated mode with PLC and SCADA or in manual mode. Salient features of this BPS include:
a) Quicker installation, Project period can be reduced to 4-5 months.
b) Package BPS includes Pumps, Motors, VFD Panel and SCADA system. Compact assembly with proper maintenance access to all components.
c) It ensures Energy efficient automated operation with smart pump control philosophy.
d) Selection of Pumps and piping layout are critical for sustainable efficient operation.
e) Comes as a plug & play, ready to commission system in auto mode.
f) Industrial grade epoxy coated fabricated steel frame mounted on RCC Raft.
g) MS ERW Piping for suction and discharge headers.
h) Pumps in N+1 configuration up to total flow 1200 M3/hr and Head 30 mtr.
i) Set of isolation & control valves- BF valves, non-return valves, air valves. Pressure Gauges, Flow and Pressure Transmitters.
j) Local SCADA Auto Operation and Emergency manual control options.
k) Proper maintenance access.
We conduct detailed engineering for Booster PS to ensure its performance including:
- Preparing GA drawing, and 3D drawing for the SKID frame and piping layout with pumps-motors, all suction, discharge piping, valves, headers, electrical & instrumentation, canopy etc.
- Conduct technical analysis.
- Fabrication of skid, painting of skid and pipes.
- Assembly of all pumps, motors, valves & fittings.
- Conducting internal inspections hydrotesting of pipe spools, NDT before dispatch to the site.
Packaged Water/ Wastewater Treatment Plant: – This includes pre-fabricated packaged water treatment plant up to 5 MLD which include flocculation tank, Coagulant dosing, agitator, tube settling tank, rapid sand gravity filters, backwash system, disinfection system and pumping system.

Packaged Sewage Treatment Plant is a decentralised, modular system for biological/domestic waste treatment, can be installed under garden/parking areas from 1 KLD to 60 KLD. Easy to maintain with very low operating cost.